Emergency Transformer

Emergency Transformer Bushing Repair and PCB Remediation

A bushing failure on a 750 kVA PCB transformer prompted the need for an emergency retrofit at a major Midwest steel mill. SUNPRO responded to repair the bushing and keep the substation operating. SUNPRO also performed the TSCA required PCB remediation of the substation. SUNPRO worked closely with the new equipment manufacturer to accelerate the production schedule for a replacement unit, and the transformer was successfully installed over a scheduled plant shutdown.