Remediation & Precision Excavation

SUNPRO implemented a non-time critical removal action at a city landfill on behalf of a state government client. Under the direction of the city’s environmental consultant, the Ohio Environmental Protection Agency and the United States Environmental Protection Agency, Region 5, SUNPRO completed this removal action. Site activities included the removal of the landfills soil cover, miscellaneous white goods and recovery of a number of unknown drummed materials while outfitted in Level B Personal Protective Equipment (PPE). Approximately 165 yards of impacted soil was excavated, characterized and properly disposed of at an off- site facility. Additional activities involved the excavation, characterization and proper disposal of approxi- mately 190 yards of PCB impacted soils. Both areas were backfilled once confirmation samples demon- strated acceptable results. Final grading was constructed utilizing a one-foot clay layer capped with topsoil and vegetative cover.  The project was completed on time and within budget.